Quality assurance in injection moulding: from component to reliable approval

MEASURE. DOCUMENT. APPROVE.
Check dimensional accuracy, identify deviations, and document results: With 3D metrology, measurement reports, and PPAP/EMPB documentation, you get the certainty you need for the next project phase.

Quality documentation and approval – we help you

For reliable statements
Your component meets the requirements. Now you just need to be able to prove it. For internal approvals, defined quality processes, or for your customer, we provide you with the appropriate measurements and quality certificates – from documented nominal-actual comparisons to EMPB documentation.

For your internal approval

Measurement values and documentation for defined quality and approval processes.

For your customer

Traceable quality certificates when you develop components or assemblies on behalf of a customer.

For the next project phase

Documented results as a basis for approval, industrialisation, or series transfer.

For your documentation obligations

From measurement report and stamped drawing to PPAP/EMPB – tailored to the requirements of your project.

How much proof does your project need?

QUALITY PACKAGES
Not every approval places the same demands on documentation. Sometimes, proof that the component geometry matches the CAD data is sufficient. Sometimes, defined inspection dimensions and the material used must be documented. And sometimes, the approval process requires complete EMPB documentation. That's why, at priomold, you decide how extensive your quality certificate should be.
3D scan of a plastic component for geometry inspection in priomold's Standard QS

Prove Geometry

Standard QS

For projects where you want to quickly and verifiably demonstrate that the manufactured component corresponds to the specified geometry.

  • 3D Scan
  • GOM Nominal/Actual Comparison
  • False-Colour Comparison

Suitable for:
Geometry inspection and documented CAD comparison.

from €350
Callipers on a plastic component for dimensional inspection and material documentation

Prove Dimensions & Material

Professional QS

When, in addition to component geometry, defined inspection characteristics and the material used also need to be documented.

  • Measurement Report
  • Stamped Drawing (up to 10 dimensions)
  • Material Certificate 3.1
  • GOM Nominal/Actual Comparison

Suitable for:
Internal approvals, customer verification, and defined quality requirements.

from €550
Employee inspecting quality documents for approval and process documentation

Document Approval & Process

Premium QS

When your company or your customer requires extensive documentation of the component, inspection, and manufacturing process.

  • PPAP / EMPB Level 2
  • Process FMEA
  • Production Control Plan
  • Process Flow Diagram
  • Inspection Instruction
  • Test Equipment Capability
  • Test Equipment List
  • Packaging Data Sheet

Optional:
MFU on 30 components as a separate item

Suitable for:
Extensive approval processes and documentation-intensive customer requirements.

from €1,250
RequirementStandard QSProfessional QSPremium QS
3D Scan✓✓as required
GOM Nominal/Actual Comparison✓✓as required
Measurement Report—✓✓
Stamped Drawing—up to 10 dimensions✓
Material Certificate 3.1—✓✓
PPAP / EMPB Level 2——✓
Process FMEA——✓
Production Control Plan——✓
Process Flow Diagram——✓
MFU, 30 components——optional

References

What our customers say
Successful projects. Satisfied customers. Real results with priomold.
Black Mighty+ vaporiser as an isolated product image with display and controls.

PEEK. Precision. Three weeks.

“In the end, a good design must also work under real conditions – that is exactly why I need real, resilient components.”
Learn more
Drawn avatar of Steffen
Dr.-Ing. Steffen Mauch
Storz & Bickel GmbH
Technical Director
Two isolated housing half-shells made of light grey plastic injection moulding with integrated reinforcing ribs and mounting domes.

Faster MedTech Certification

“Especially with time-critical projects, we know that we can always rely on priomold.”
Learn more
Drawn avatar of Sven with metal-framed glasses
Sven Krämer
Standard Instruments GmbH
Managing Director

FAQs on Quality Packages

FAQs
Answers to your questions about scope, certifications, measurement reports, and 3D scans.

An Initial Sample Inspection Report documents whether a manufactured component meets the defined requirements from the drawing and specification. It is typically used for approval processes – for example, before series production starts, after tool changes, or if your internal quality process requires documented proof.

In a nominal-actual comparison, the measured component geometry is superimposed with the CAD nominal data. Deviations between the nominal and actual geometry are displayed as a false-colour comparison across the surface. This allows for quick identification and evaluation of, for example, warpage, shrinkage, or local geometric deviations.

A 3D scan captures the component surface across its area and enables comparison with the CAD model. A measurement report, on the other hand, documents defined inspection characteristics and their measured values, including the specified tolerances. Which inspection is appropriate depends on the proof you require for your project.

In a stamped drawing, the characteristics to be inspected on a technical drawing are clearly marked and assigned to the corresponding results in the measurement report. This ensures traceability of which measurement value belongs to which drawing characteristic. The Professional QS package from priomold includes up to ten dimensions.

Level 2 sampling documents the agreed quality and process evidence for component approval. At priomold, the Premium QS package includes, among other things, EMPB Level 2, Process FMEA, Production Control Plan, Process Flow Diagram, Inspection Instruction, Test Equipment Capability, Test Equipment List, and Packaging Data Sheet.

An MFU examines, based on a defined number of consecutively manufactured components, how reproducibly the manufacturing process produces selected characteristics within the specified tolerances. At priomold, an MFU can be carried out on 30 components as an additional item to the Premium QS package.

Yes. Inspection characteristics, drawings, and existing quality requirements can be considered during project planning. The required quality documents can also be provided in German, English, or French – for example, if you are developing on behalf of an international customer or need to meet their approval process.

Yes. priomold’s quality management system is certified by TÜV SÜD according to DIN EN ISO 9001:2015.

Still haven't found the right answer?
Just write to us – we're happy to help!
Freigestelltes Porträt von Tom Green aus dem Kundenmanagement Vertrieb bei priomoldFreigestelltes Porträt von Stefan Geist aus dem Kundenmanagement Vertrieb bei priomold
Still have questions about quality packages?
We will be happy to assist you and find the right solution for you.
Contact us

Or write to us at info@priomold.de

Fast response
Personal contact
Clear, direct answers